BIPV Roof integrated Photovoltaic Support Waterproof System
BIPV provides new sustainable energy solutions that reduce building carbon emissions by reducing energy consumption
The versatility of the BIPV system provides different choices for walls, roofs, windows, etc. in industrial and commercial buildings
- Lester
- China
- 14 weekdays
- AL6005-T5
- IAF
- AS/NZS 1170,DIN 1055,JIS C8955:2017
- 10Years
- 25Years
- Information
BIPV ROOF PHOTOVOLTAIC WATERPROOF BRACKET
Product Description
BIPV rooftop photovoltaic brackets are an innovative application that combines solar power generation with buildings, achieving a perfect combination of aesthetics and functionality. Replacing traditional building materials with photovoltaic materials and installing them on the
roof and outer walls of buildings can efficiently utilize the building area, enhance the aesthetic value of the building, and bring over 30%
energy-saving effects to enterprises, extending the service life of the roof to over 25 years.
TECHNICAL PARAMETER | |
Gradient | 5 °~50 ° (from 8% to 120%) |
Wind load | 60m/s |
Snow load | 1.6KN/㎡ |
Applicable battery panel type | Framed |
Battery panel layout method | Horizontal and vertical arrangement |
Design standards | AS/NZS 1170,DIN 1055,JIS C8955:2017, |
International Building Code:IBC 2009, | |
California Building Code:CBC 2010; | |
Bracket material | AL6005-T5 (surface anodizing) |
Fastener material | Stainless steel SUS304&zinc nickel alloy&hot-dip galvanizing |
Material of spare parts | AL6005-T5 (surface anodizing) |
Bracket color | Natural silver color or colored according to customer requirements |
System warranty | 10 years |
PRODUCT FEATURES:
Adopting a guide rail with a sink, it has good drainage performance and waterproof effect
The material is aluminum alloy+304 stainless steel, with a long service life
Easy installation, most of the parts are pre installed,no need for gluing
Low maintenance cost in the later stage, almost no maintenance required
BIPV installation is simple and beautiful, perfectly integrated with the building
Project Case